Solar PV, BESS and AI-data-centre BESS manufacturing
Build 2032–2034 at 55% construction value-added, then 8% of capex per year operating. Peak US$348M/yr · cumulative 2026–40 US$1.9B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 5 km | |
| Major highway | 9 km | |
| Transmission ≥230 kV | 24 km | |
| Pipeline | 33 km | |
| Port | Hamilton | 13 km |
| Generating station | Sir Adam Beck 1–2 (2,166 MW) | 79 km |
| City >50k | Hamilton | 15 km |
| Xanadu — Large-Scale Quantum Machine | Digital Technology | 62 km |
| Xanadu — Quantum Manufacturing Facility | Digital Technology | 69 km |
| Vianode Synthetic Graphite Plant | Advanced Manufacturing | 112 km |
| PowerCo (Volkswagen) Gigafactory | Advanced Manufacturing | 113 km |
| Darlington New Nuclear (SMR ×4) | Power & Utilities | 121 km |
| Alto High-Speed Rail (Toronto–Québec City) | Advanced / FEED | US$44B – US$66B |
| Deep Geological Repository (Ignace) | Feasibility / permitting | US$19B |
| Darlington New Nuclear (SMR ×4) | Under construction | US$15B |
| PowerCo (Volkswagen) Gigafactory | Under construction | US$5.1B |
| VIA Rail fleet — 313 cars (Thunder Bay) | Under construction | US$3.4B |
| Crawford Nickel | Advanced / FEED | US$2.0B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register