Minerals & Metals · ON · #31 of 131 disclosed prospectus tickets

Crawford Nickel

Summit deal plate Fast-track list (MPO)

1.6 Mt Ni over 40 yrs; MPO-referred

At a glance

Proponent
Canada Nickel Company
Capex (as printed)
US$2.0B
Capex (US$, midpoint)
US$2.0B
Stage
Advanced / FEED
Location
48.60°N, 81.20°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2028–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$300M/yr · cumulative 2026–40 US$3.6B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway34 km
Major highway330 km
Transmission ≥230 kV383 km
Pipeline288 km
PortMidland439 km
Generating stationHenvey Inlet Wind (300 MW)304 km
City >50kSudbury234 km

Nearest other projects

Dumont NickelMinerals & Metals213 km
Bissett Creek Graphite + BAMMinerals & Metals345 km
Micro-Modular Reactor PlatformPower & Utilities405 km
Bruce CPower & Utilities476 km
Moblan LithiumMinerals & Metals501 km

Also in Ontario

Alto High-Speed Rail (Toronto–Québec City)Advanced / FEEDUS$44B – US$66B
Deep Geological Repository (Ignace)Feasibility / permittingUS$19B
Darlington New Nuclear (SMR ×4)Under constructionUS$15B
PowerCo (Volkswagen) GigafactoryUnder constructionUS$5.1B
VIA Rail fleet — 313 cars (Thunder Bay)Under constructionUS$3.4B
Via TWO (synthetic graphite)Advanced / FEEDUS$2.0B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register