Minerals & Metals · ON · #34 of 131 disclosed prospectus tickets

Via TWO (synthetic graphite)

Summit deal plate

150 ktpa Phase 2 anode material; FEED complete

At a glance

Proponent
Howard Ormonroyd (proponent)
Capex (as printed)
US$2.0B
Capex (US$, midpoint)
US$2.0B
Stage
Advanced / FEED
Location
43.00°N, 82.35°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$300M/yr · cumulative 2026–40 US$3.6B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway5 km
Major highway12 km
Transmission ≥230 kV160 km
Pipeline5 km
PortWindsor95 km
Generating stationBruce A/B (6,550 MW)160 km
City >50kSarnia6 km

Nearest other projects

PowerCo (Volkswagen) GigafactoryAdvanced Manufacturing97 km
Vianode Synthetic Graphite PlantAdvanced Manufacturing102 km
Bruce CPower & Utilities160 km
10 GW Integrated Gigafactory CampusClean Energy194 km
Xanadu — Large-Scale Quantum MachineDigital Technology249 km

Also in Ontario

Alto High-Speed Rail (Toronto–Québec City)Advanced / FEEDUS$44B – US$66B
Deep Geological Repository (Ignace)Feasibility / permittingUS$19B
Darlington New Nuclear (SMR ×4)Under constructionUS$15B
PowerCo (Volkswagen) GigafactoryUnder constructionUS$5.1B
VIA Rail fleet — 313 cars (Thunder Bay)Under constructionUS$3.4B
Crawford NickelAdvanced / FEEDUS$2.0B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register