50-yr Ni-Co mine; construction-ready
Build 2027–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$162M/yr · cumulative 2026–40 US$1.9B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 23 km | |
| Major highway | 391 km | |
| Transmission ≥230 kV | 174 km | |
| Pipeline | 270 km | |
| Port | Ottawa | 404 km |
| Generating station | Henvey Inlet Wind (300 MW) | 347 km |
| City >50k | North Bay | 270 km |
| Crawford Nickel | Minerals & Metals | 213 km |
| Bissett Creek Graphite + BAM | Minerals & Metals | 267 km |
| Micro-Modular Reactor Platform | Power & Utilities | 292 km |
| Moblan Lithium | Minerals & Metals | 324 km |
| Troilus Copper-Gold | Minerals & Metals | 374 km |
| Kino Aski LNG (cross-Canada to Québec port) | Early / concept | US$23B |
| Projet Mauricie | Advanced / FEED | US$3.0B |
| Strange Lake Rare Earths | Feasibility / permitting | US$2.2B |
| Courant Project (H₂ + hydro for ammonium nitrate) | Advanced / FEED | US$1.8B – US$2.1B |
| Contrecœur Container Terminal | Advanced / FEED | US$1.7B |
| Matawinie Graphite Mine | Advanced / FEED | US$1.3B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register