Transportation · NT

Arctic Economic & Security Corridor

Summit deal plate Fast-track list (MPO) Transformative strategy

MPO-referred

At a glance

Proponent
GNWT / Indigenous partners
Capex (as printed)
not disclosed C$ source
Capex (US$, midpoint)
not disclosed
Stage
Early / concept
Location
65.00°N, 120.00°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
Yes — referred to the Major Projects Office
Transformative strategy
Yes — corridor-scale program developed with the province
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway509 km
Major highway901 km
Transmission ≥230 kV980 km
Pipeline704 km
PortTuktoyaktuk743 km
Generating stationSite C (1,100 MW)980 km
City >50kPrince George1,242 km

Nearest other projects

NICO Cobalt-Gold-Bismuth-CopperMinerals & Metals216 km
Yellowknife Lithium + ConversionMinerals & Metals405 km
Mackenzie Valley HighwayTransportation408 km
Prairie Creek Silver-Zinc (PC Silver)Minerals & Metals452 km
Nechalacho Basal Rare EarthMinerals & Metals488 km

Also in Northwest Territories

Nechalacho Basal Rare EarthFeasibility / permittingUS$2.1B
Pine Point Zinc-LeadFeasibility / permittingUS$2.0B
NICO Cobalt-Gold-Bismuth-CopperAdvanced / FEEDUS$720M
Prairie Creek Silver-Zinc (PC Silver)Shovel-readyUS$350M
Yellowknife Lithium + ConversionFeasibility / permittingUS$259M
Mackenzie Valley HighwayAdvanced / FEEDnot disclosed