Minerals & Metals · NT/AB · #105 of 131 disclosed prospectus tickets

Yellowknife Lithium + Conversion

Summit deal plate

30 ktpa lithium carbonate conversion

At a glance

Proponent
Li-FT Power
Capex (as printed)
US$259M
Capex (US$, midpoint)
US$259M
Stage
Feasibility / permitting
Location
62.50°N, 114.00°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$71M/yr · cumulative 2026–40 US$473M.

US$0MUS$20MUS$40MUS$60M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway186 km
Major highway979 km
Transmission ≥230 kV661 km
Pipeline627 km
PortTuktoyaktuk1,146 km
Generating stationSite C (1,100 MW)801 km
City >50kEdmonton995 km

Nearest other projects

Nechalacho Basal Rare EarthMinerals & Metals85 km
Pine Point Zinc-LeadMinerals & Metals185 km
NICO Cobalt-Gold-Bismuth-CopperMinerals & Metals191 km
Taltson Hydro ExpansionPower & Utilities264 km
Arctic Economic & Security CorridorTransportation405 km

Also in Northwest Territories

Nechalacho Basal Rare EarthFeasibility / permittingUS$2.1B
Pine Point Zinc-LeadFeasibility / permittingUS$2.0B
NICO Cobalt-Gold-Bismuth-CopperAdvanced / FEEDUS$720M
Prairie Creek Silver-Zinc (PC Silver)Shovel-readyUS$350M
Mackenzie Valley HighwayAdvanced / FEEDnot disclosed
Arctic Economic & Security CorridorEarly / conceptnot disclosed