Conventional Energy · QC · #6 of 131 disclosed prospectus tickets

Kino Aski LNG (cross-Canada to Québec port)

Summit deal plate

15 MTPA LNG export via Québec port; pre-application

At a glance

Proponent
Yves Crits (proponent)
Capex (as printed)
US$23B
Capex (US$, midpoint)
US$23B
Stage
Early / concept
Location
48.35°N, 70.85°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location and corridor alignment.

Modelled GDP contribution Modelled

Build 2032–2037 at 55% construction value-added, then 12% of capex per year operating. Peak US$2.8B/yr · cumulative 2026–40 US$20B.

US$0MUS$1.0BUS$2.0BUS$3.0B2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway4 km
Major highway112 km
Transmission ≥230 kV101 km
Pipeline375 km
PortChicoutimi17 km
Generating stationRivière-du-Moulin Wind (350 MW)28 km
City >50kChicoutimi18 km

Nearest other projects

Saguenay Industrial & Port ZoneMarine & Port7 km
Port of Québec ModernizationMarine & Port172 km
Pozzolan & SCMsMinerals & Metals177 km
Projet MauricieClean Energy246 km
Bécancour Cobalt FacilityMinerals & Metals247 km

Also in Quebec

Projet MauricieAdvanced / FEEDUS$3.0B
Strange Lake Rare EarthsFeasibility / permittingUS$2.2B
Courant Project (H₂ + hydro for ammonium nitrate)Advanced / FEEDUS$1.8B – US$2.1B
Contrecœur Container TerminalAdvanced / FEEDUS$1.7B
Matawinie Graphite MineAdvanced / FEEDUS$1.3B
Port of Québec ModernizationAdvanced / FEEDUS$1.2B