Minerals & Metals · QC · #109 of 131 disclosed prospectus tickets

Bécancour Cobalt Facility

Summit deal plate

3,300 tpa high-purity cobalt

At a glance

Proponent
Fedor van der Post (proponent)
Capex (as printed)
US$217M – US$250M
Capex (US$, midpoint)
US$217M – US$250M
Stage
Advanced / FEED
Location
46.37°N, 72.35°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$64M/yr · cumulative 2026–40 US$496M.

US$0MUS$20MUS$40MUS$60M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway28 km
Major highway10 km
Transmission ≥230 kV43 km
Pipeline133 km
PortTrois-Rivieres (Three Rivers)15 km
Generating stationBeauharnois (1,900 MW)169 km
City >50kTrois-Rivières16 km

Nearest other projects

LFP Cathode Active Materials PlantClean Energy4 km
Bécancour Battery Material PlantMinerals & Metals9 km
Courant Project (H₂ + hydro for ammonium nitrate)Clean Energy19 km
Projet MauricieClean Energy37 km
Canadian Sovereign Magnesium PlatformMinerals & Metals74 km

Also in Quebec

Kino Aski LNG (cross-Canada to Québec port)Early / conceptUS$23B
Projet MauricieAdvanced / FEEDUS$3.0B
Strange Lake Rare EarthsFeasibility / permittingUS$2.2B
Courant Project (H₂ + hydro for ammonium nitrate)Advanced / FEEDUS$1.8B – US$2.1B
Contrecœur Container TerminalAdvanced / FEEDUS$1.7B
Matawinie Graphite MineAdvanced / FEEDUS$1.3B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register