Minerals & Metals · QC

Matawinie Graphite Mine

Context — not in prospectus Fast-track list (MPO)

MPO tranche 2

At a glance

Proponent
Nouveau Monde Graphite
Capex (as printed)
C$1.8B C$ source
Capex (US$, midpoint)
US$1.3B
Stage
Advanced / FEED
Location
46.70°N, 73.90°W
Summit deal plate
No — context project (not in the investor prospectus)
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 15% of capex per year operating. Peak US$241M/yr · cumulative 2026–40 US$2.6B.

US$0MUS$100MUS$200M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway109 km
Major highway80 km
Transmission ≥230 kV57 km
Pipeline130 km
PortSorel95 km
Generating stationBeauharnois (1,900 MW)156 km
City >50kSt.-Jerome104 km

Nearest other projects

Projet MauricieClean Energy89 km
Courant Project (H₂ + hydro for ammonium nitrate)Clean Energy105 km
Contrecœur Container TerminalMarine & Port107 km
Bécancour Battery Material PlantMinerals & Metals118 km
LFP Cathode Active Materials PlantClean Energy121 km

Also in Quebec

Kino Aski LNG (cross-Canada to Québec port)Early / conceptUS$23B
Projet MauricieAdvanced / FEEDUS$3.0B
Strange Lake Rare EarthsFeasibility / permittingUS$2.2B
Courant Project (H₂ + hydro for ammonium nitrate)Advanced / FEEDUS$1.8B – US$2.1B
Contrecœur Container TerminalAdvanced / FEEDUS$1.7B
Port of Québec ModernizationAdvanced / FEEDUS$1.2B