Clean Energy · AB · #69 of 131 disclosed prospectus tickets

East Calgary Carbon Sequestration Hub

Summit deal plate

8.6 Mt CO₂/yr storage

At a glance

Proponent
Stephen W. Mason (proponent)
Capex (as printed)
US$720M
Capex (US$, midpoint)
US$720M
Stage
Feasibility / permitting
Location
51.00°N, 113.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2032 at 55% construction value-added, then 8% of capex per year operating. Peak US$132M/yr · cumulative 2026–40 US$828M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway15 km
Major highway23 km
Transmission ≥230 kV33 km
Pipeline33 km
PortSquamish694 km
Generating stationShepard Energy Centre (860 MW)22 km
City >50kCalgary35 km

Nearest other projects

Prairie Economic GatewayMarine & Port21 km
Deep Sky One (direct air capture)Clean Energy117 km
Calgary–Edmonton High-Speed RailTransportation145 km
Western Canada Single Super PhosphateMinerals & Metals196 km
BW Velora — Redcliff (Medicine Hat)Digital Technology224 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B