Generation + storage hub for industrial / data-centre load
Build 2028–2031 at 55% construction value-added, then 8% of capex per year operating. Peak US$550M/yr · cumulative 2026–40 US$4.9B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 28 km | |
| Major highway | 47 km | |
| Transmission ≥230 kV | 58 km | |
| Pipeline | 33 km | |
| Port | Squamish | 735 km |
| Generating station | Genesee (1,400 MW) | 0 km |
| City >50k | Edmonton | 58 km |
| Clearwater (direct lithium extraction) | Minerals & Metals | 49 km |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Conventional Energy | 73 km |
| Gasia Homestead Diluent Recovery & Partial Upgrader | Conventional Energy | 84 km |
| Alberta Critical Minerals Recovery & REE Refining | Minerals & Metals | 93 km |
| Blue & Turquoise Hydrogen / Methanol Modular Plant | Conventional Energy | 94 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |
| Prairie Connector Pipeline | Advanced / FEED | US$2.1B |