MPO-referred
No disclosed capex.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 158 km | |
| Major highway | 753 km | |
| Transmission ≥230 kV | 412 km | |
| Pipeline | 643 km | |
| Port | Churchill | 1,000 km |
| Generating station | Site C (1,100 MW) | 711 km |
| City >50k | Edmonton | 769 km |
| Pine Point Zinc-Lead | Minerals & Metals | 161 km |
| Nechalacho Basal Rare Earth | Minerals & Metals | 195 km |
| Yellowknife Lithium + Conversion | Minerals & Metals | 264 km |
| Rook I Uranium | Minerals & Metals | 303 km |
| PLS (Triple R) Uranium | Minerals & Metals | 329 km |
| Nechalacho Basal Rare Earth | Feasibility / permitting | US$2.1B |
| Pine Point Zinc-Lead | Feasibility / permitting | US$2.0B |
| NICO Cobalt-Gold-Bismuth-Copper | Advanced / FEED | US$720M |
| Prairie Creek Silver-Zinc (PC Silver) | Shovel-ready | US$350M |
| Yellowknife Lithium + Conversion | Feasibility / permitting | US$259M |
| Mackenzie Valley Highway | Advanced / FEED | not disclosed |