3 Moz M&I; heap leach
Build 2028–2030 at 55% construction value-added, then 15% of capex per year operating. Peak US$132M/yr · cumulative 2026–40 US$1.4B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 330 km | |
| Major highway | 125 km | |
| Transmission ≥230 kV | 833 km | |
| Pipeline | 1,004 km | |
| Port | Tuktoyaktuk | 779 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 1,226 km |
| City >50k | Prince George | 1,380 km |
| Casino Copper-Gold | Minerals & Metals | 34 km |
| Minto Copper/Gold/Silver (restart) | Minerals & Metals | 110 km |
| MacTung Tungsten | Minerals & Metals | 460 km |
| Kudz Ze Kayah | Minerals & Metals | 486 km |
| New Polaris (gold-antimony) | Minerals & Metals | 566 km |
| Casino Copper-Gold | Feasibility / permitting | US$2.9B |
| Kudz Ze Kayah | Advanced / FEED | US$492M |
| Minto Copper/Gold/Silver (restart) | Feasibility / permitting | US$200M |
| MacTung Tungsten | Feasibility / permitting | not disclosed |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register