100 koz Au; 500–600 tpa antimony
Build 2028–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$55M/yr · cumulative 2026–40 US$425M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 138 km | |
| Major highway | 654 km | |
| Transmission ≥230 kV | 272 km | |
| Pipeline | 599 km | |
| Port | Stewart | 370 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 734 km |
| City >50k | Prince George | 843 km |
| Red Chris Mine Expansion | Minerals & Metals | 238 km |
| Kudz Ze Kayah | Minerals & Metals | 341 km |
| Red Mountain & Premier Gold | Minerals & Metals | 371 km |
| Lawyers-Ranch Gold-Silver | Minerals & Metals | 392 km |
| Ksi Lisims LNG + PRGT Pipeline | Conventional Energy | 467 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |