Minerals & Metals · QC · #104 of 131 disclosed prospectus tickets

Bécancour Battery Material Plant

Summit deal plate

Graphite → anode material

At a glance

Proponent
Nouveau Monde Graphite
Capex (as printed)
US$267M
Capex (US$, midpoint)
US$267M
Stage
Feasibility / permitting
Location
46.33°N, 72.45°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$73M/yr · cumulative 2026–40 US$487M.

US$0MUS$20MUS$40MUS$60MUS$80M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway28 km
Major highway8 km
Transmission ≥230 kV37 km
Pipeline124 km
PortTrois-Rivieres (Three Rivers)7 km
Generating stationBeauharnois (1,900 MW)160 km
City >50kTrois-Rivières8 km

Nearest other projects

LFP Cathode Active Materials PlantClean Energy4 km
Bécancour Cobalt FacilityMinerals & Metals9 km
Courant Project (H₂ + hydro for ammonium nitrate)Clean Energy14 km
Projet MauricieClean Energy34 km
Canadian Sovereign Magnesium PlatformMinerals & Metals74 km

Also in Quebec

Kino Aski LNG (cross-Canada to Québec port)Early / conceptUS$23B
Projet MauricieAdvanced / FEEDUS$3.0B
Strange Lake Rare EarthsFeasibility / permittingUS$2.2B
Courant Project (H₂ + hydro for ammonium nitrate)Advanced / FEEDUS$1.8B – US$2.1B
Contrecœur Container TerminalAdvanced / FEEDUS$1.7B
Matawinie Graphite MineAdvanced / FEEDUS$1.3B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register