Graphite → anode material
Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$73M/yr · cumulative 2026–40 US$487M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 28 km | |
| Major highway | 8 km | |
| Transmission ≥230 kV | 37 km | |
| Pipeline | 124 km | |
| Port | Trois-Rivieres (Three Rivers) | 7 km |
| Generating station | Beauharnois (1,900 MW) | 160 km |
| City >50k | Trois-Rivières | 8 km |
| LFP Cathode Active Materials Plant | Clean Energy | 4 km |
| Bécancour Cobalt Facility | Minerals & Metals | 9 km |
| Courant Project (H₂ + hydro for ammonium nitrate) | Clean Energy | 14 km |
| Projet Mauricie | Clean Energy | 34 km |
| Canadian Sovereign Magnesium Platform | Minerals & Metals | 74 km |
| Kino Aski LNG (cross-Canada to Québec port) | Early / concept | US$23B |
| Projet Mauricie | Advanced / FEED | US$3.0B |
| Strange Lake Rare Earths | Feasibility / permitting | US$2.2B |
| Courant Project (H₂ + hydro for ammonium nitrate) | Advanced / FEED | US$1.8B – US$2.1B |
| Contrecœur Container Terminal | Advanced / FEED | US$1.7B |
| Matawinie Graphite Mine | Advanced / FEED | US$1.3B |