Minerals & Metals · SK · #39 of 131 disclosed prospectus tickets

Rook I Uranium

Summit deal plate

30 Mlb U₃O₈/yr; under construction

At a glance

Proponent
NexGen Energy
Capex (as printed)
US$1.6B
Capex (US$, midpoint)
US$1.6B
Stage
Under construction
Location
57.90°N, 109.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2026–2028 at 55% construction value-added, then 15% of capex per year operating. Peak US$293M/yr · cumulative 2026–40 US$3.6B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway168 km
Major highway527 km
Transmission ≥230 kV172 km
Pipeline542 km
PortChurchill904 km
Generating stationGenesee (1,400 MW)587 km
City >50kEdmonton542 km

Nearest other projects

PLS (Triple R) UraniumMinerals & Metals27 km
Wheeler River UraniumMinerals & Metals246 km
Taltson Hydro ExpansionPower & Utilities303 km
Loki Flake GraphiteMinerals & Metals387 km
Marguerite Lake Energy (CAES)Power & Utilities397 km

Also in Saskatchewan

Loki Flake GraphiteFeasibility / permittingUS$1.4B
PLS (Triple R) UraniumAdvanced / FEEDUS$1.2B
Prairie LithiumUnder constructionUS$881M
Covenant Energy (renewable diesel + SAF)Advanced / FEEDUS$653M
Boardwalk Lithium BrineFeasibility / permittingUS$600M
Project Titan (sulphate of potash)Shovel-readyUS$150M – US$900M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register