Conventional Energy · AB · #126 of 131 disclosed prospectus tickets

Gasia Homestead Diluent Recovery & Partial Upgrader

Summit deal plate

Diluted bitumen → condensate + synthetic crude, Industrial Heartland

At a glance

Proponent
Gasia Energy
Capex (as printed)
US$150M
Capex (US$, midpoint)
US$150M
Stage
Advanced / FEED
Location
53.70°N, 113.20°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 12% of capex per year operating. Peak US$41M/yr · cumulative 2026–40 US$272M.

US$0MUS$20MUS$40M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway11 km
Major highway12 km
Transmission ≥230 kV26 km
Pipeline26 km
PortSquamish818 km
Generating stationGenesee (1,400 MW)84 km
City >50kEdmonton26 km

Nearest other projects

Alberta Critical Minerals Recovery & REE RefiningMinerals & Metals10 km
Blue & Turquoise Hydrogen / Methanol Modular PlantConventional Energy10 km
Low-Carbon Synthetic Gasoline Facilities (×2)Conventional Energy13 km
Alberta Industrial Heartland 1.0 (waste-to-energy + CCS)Clean Energy17 km
Clearwater (direct lithium extraction)Minerals & Metals62 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register