Conventional Energy · AB · #90 of 131 disclosed prospectus tickets

Blue & Turquoise Hydrogen / Methanol Modular Plant

Summit deal plate

Blue methanol and hydrogen from natural gas

At a glance

Proponent
Vandit Verma (proponent)
Capex (as printed)
US$440M
Capex (US$, midpoint)
US$440M
Stage
Advanced / FEED
Location
53.76°N, 113.08°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 12% of capex per year operating. Peak US$121M/yr · cumulative 2026–40 US$796M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway13 km
Major highway22 km
Transmission ≥230 kV36 km
Pipeline36 km
PortSquamish828 km
Generating stationGenesee (1,400 MW)94 km
City >50kEdmonton36 km

Nearest other projects

Alberta Critical Minerals Recovery & REE RefiningMinerals & Metals5 km
Alberta Industrial Heartland 1.0 (waste-to-energy + CCS)Clean Energy7 km
Gasia Homestead Diluent Recovery & Partial UpgraderConventional Energy10 km
Low-Carbon Synthetic Gasoline Facilities (×2)Conventional Energy23 km
Clearwater (direct lithium extraction)Minerals & Metals71 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B