Clean Energy · AB · #63 of 131 disclosed prospectus tickets

Alberta Industrial Heartland 1.0 (waste-to-energy + CCS)

Summit deal plate

205 kt MSW; 200 kt CO₂ stored; post-FEED

At a glance

Proponent
Mikael Blom (proponent)
Capex (as printed)
US$800M
Capex (US$, midpoint)
US$800M
Stage
Shovel-ready
Location
53.80°N, 113.00°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2027–2029 at 55% construction value-added, then 8% of capex per year operating. Peak US$147M/yr · cumulative 2026–40 US$1.1B.

US$0MUS$50MUS$100MUS$150M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway7 km
Major highway29 km
Transmission ≥230 kV43 km
Pipeline43 km
PortSquamish835 km
Generating stationGenesee (1,400 MW)101 km
City >50kEdmonton43 km

Nearest other projects

Blue & Turquoise Hydrogen / Methanol Modular PlantConventional Energy7 km
Alberta Critical Minerals Recovery & REE RefiningMinerals & Metals9 km
Gasia Homestead Diluent Recovery & Partial UpgraderConventional Energy17 km
Low-Carbon Synthetic Gasoline Facilities (×2)Conventional Energy30 km
Vegreville Project (straw → SAF)Clean Energy71 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register