E-methanol / e-SAF from biogenic carbon
Build 2032–2034 at 55% construction value-added, then 8% of capex per year operating. Peak US$183M/yr · cumulative 2026–40 US$990M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 2 km | |
| Major highway | 4 km | |
| Transmission ≥230 kV | 0 km | |
| Pipeline | 135 km | |
| Port | Chatham | 116 km |
| Generating station | Point Lepreau (660 MW) | 172 km |
| City >50k | Moncton | 3 km |
| Eauclaire FORCE Tidal Array | Clean Energy | 87 km |
| Port Saint John Optimization | Marine & Port | 135 km |
| Beacon Data Centres — Spruce Lake | Digital Technology | 144 km |
| Mactaquac Life Achievement Project | Power & Utilities | 161 km |
| Enfield RTP Clean Fuel Facility | Clean Energy | 163 km |
| Mactaquac Life Achievement Project | Advanced / FEED | US$5.1B – US$6.6B |
| Beacon Data Centres — Spruce Lake | Advanced / FEED | US$3.9B |
| Port of Belledune Iron-Ore Terminal | Early / concept | US$1.5B |
| Sisson Tungsten-Molybdenum | Advanced / FEED | US$600M |
| New Nuclear in New Brunswick | Advanced / FEED | not disclosed |
| Port Saint John Optimization | Advanced / FEED | not disclosed |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register