Minerals & Metals · NB · #77 of 131 disclosed prospectus tickets

Sisson Tungsten-Molybdenum

Summit deal plate Fast-track list (MPO)

MPO-referred

At a glance

Proponent
Northcliff Resources
Capex (as printed)
US$600M
Capex (US$, midpoint)
US$600M
Stage
Advanced / FEED
Location
46.35°N, 67.05°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 15% of capex per year operating. Peak US$110M/yr · cumulative 2026–40 US$1.2B.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway11 km
Major highway49 km
Transmission ≥230 kV47 km
Pipeline133 km
PortChatham143 km
Generating stationPoint Lepreau (660 MW)150 km
City >50kFredericton55 km

Nearest other projects

Mactaquac Life Achievement ProjectPower & Utilities47 km
Beacon Data Centres — Spruce LakeDigital Technology139 km
Port Saint John OptimizationMarine & Port143 km
New Nuclear in New BrunswickClean Energy150 km
Atlantic Canada E-FuelsClean Energy175 km

Also in New Brunswick

Mactaquac Life Achievement ProjectAdvanced / FEEDUS$5.1B – US$6.6B
Beacon Data Centres — Spruce LakeAdvanced / FEEDUS$3.9B
Port of Belledune Iron-Ore TerminalEarly / conceptUS$1.5B
Atlantic Canada E-FuelsEarly / conceptUS$1.0B
New Nuclear in New BrunswickAdvanced / FEEDnot disclosed
Port Saint John OptimizationAdvanced / FEEDnot disclosed

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register