Power & Utilities · NU

Iqaluit Nukkiksautiit Hydro

Context — not in prospectus Fast-track list (MPO)

MPO tranche 2

At a glance

Proponent
Nunavut Nukkiksautiit Corp.
Capex (as printed)
not disclosed C$ source
Capex (US$, midpoint)
not disclosed
Stage
Early / concept
Location
63.75°N, 68.50°W
Summit deal plate
No — context project (not in the investor prospectus)
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway1,001 km
Major highway1,738 km
Transmission ≥230 kV1,165 km
Pipeline2,049 km
PortIqaluit0 km
Generating stationLa Grande-4 (2,779 MW)1,136 km
City >50kChicoutimi1,710 km

Nearest other projects

Qik Port (Qikiqtarjuaq)Marine & Port470 km
Ashram Rare Earths & FluorsparMinerals & Metals762 km
Strange Lake Rare EarthsMinerals & Metals862 km
Shaakichiuwaanaan (Li-Ta-Cs)Minerals & Metals1,126 km
Churchill Falls / Gull Island HydroPower & Utilities1,168 km

Also in Nunavut

Kivalliq Hydro-Fibre LinkAdvanced / FEEDUS$3.4B
Grays Bay Road and PortAdvanced / FEEDUS$850M
Qik Port (Qikiqtarjuaq)Shovel-readyUS$350M
True North GoldShovel-readyUS$42M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register