World's largest caesium resource
Build 2030–2032 at 55% construction value-added, then 15% of capex per year operating. Peak US$202M/yr · cumulative 2026–40 US$1.8B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 255 km | |
| Major highway | 660 km | |
| Transmission ≥230 kV | 351 km | |
| Pipeline | 927 km | |
| Port | Chicoutimi | 586 km |
| Generating station | La Grande-4 (2,779 MW) | 192 km |
| City >50k | Chicoutimi | 586 km |
| Lac Knife Graphite | Minerals & Metals | 266 km |
| Kami Iron Ore | Minerals & Metals | 276 km |
| Scully Manganese Sulphate | Minerals & Metals | 283 km |
| Rose Lithium-Tantalum | Minerals & Metals | 374 km |
| Ashram Rare Earths & Fluorspar | Minerals & Metals | 395 km |
| Kino Aski LNG (cross-Canada to Québec port) | Early / concept | US$23B |
| Projet Mauricie | Advanced / FEED | US$3.0B |
| Strange Lake Rare Earths | Feasibility / permitting | US$2.2B |
| Courant Project (H₂ + hydro for ammonium nitrate) | Advanced / FEED | US$1.8B – US$2.1B |
| Contrecœur Container Terminal | Advanced / FEED | US$1.7B |
| Matawinie Graphite Mine | Advanced / FEED | US$1.3B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register