Power & Utilities · NU/MB · #20 of 131 disclosed prospectus tickets

Kivalliq Hydro-Fibre Link

Summit deal plate Manitoba

1,200 km corridor from Manitoba grid; 150 MW + broadband

At a glance

Proponent
Nukik Corporation
Capex (as printed)
US$3.4B
Capex (US$, midpoint)
US$3.4B
Stage
Advanced / FEED
Location
62.80°N, 92.10°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location and corridor alignment.

Modelled GDP contribution Modelled

Build 2028–2031 at 55% construction value-added, then 7% of capex per year operating. Peak US$468M/yr · cumulative 2026–40 US$3.9B.

US$0MUS$200MUS$400M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway462 km
Major highway1,464 km
Transmission ≥230 kV733 km
Pipeline1,456 km
PortChurchill462 km
Generating stationLimestone (1,340 MW)709 km
City >50kSaskatoon1,461 km

Nearest other projects

True North GoldMinerals & Metals255 km
Port of Churchill PlusMarine & Port462 km
Conawapa Hydro (revived)Power & Utilities702 km
Thompson Nickel MineMinerals & Metals850 km
Wheeler River UraniumMinerals & Metals936 km

Also in Nunavut

Grays Bay Road and PortAdvanced / FEEDUS$850M
Qik Port (Qikiqtarjuaq)Shovel-readyUS$350M
True North GoldShovel-readyUS$42M
Iqaluit Nukkiksautiit HydroEarly / conceptnot disclosed

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register