Up to 14,000 MW; pitched at summit by NL
Build 2028–2035 at 55% construction value-added, then 7% of capex per year operating. Peak US$2.6B/yr · cumulative 2026–40 US$32B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 147 km | |
| Major highway | 652 km | |
| Transmission ≥230 kV | 3 km | |
| Pipeline | 927 km | |
| Port | Goose Bay | 243 km |
| Generating station | Churchill Falls (5,428 MW) | 3 km |
| City >50k | Chicoutimi | 749 km |
| Scully Manganese Sulphate | Minerals & Metals | 201 km |
| Kami Iron Ore | Minerals & Metals | 213 km |
| Lac Knife Graphite | Minerals & Metals | 227 km |
| Strange Lake Rare Earths | Minerals & Metals | 311 km |
| Shaakichiuwaanaan (Li-Ta-Cs) | Minerals & Metals | 456 km |
| EVREC Green Energy Hub | Advanced / FEED | US$11B |
| North Atlantic Green Energy Hub | Advanced / FEED | US$5.1B |
| Kami Iron Ore | Feasibility / permitting | US$3.0B |
| Bay d'Espoir Hydro Upgrade | Feasibility / permitting | US$1.1B |
| Project Oqwatn (St. John's Dockyard) | Advanced / FEED | US$750M |
| Scully Manganese Sulphate | Feasibility / permitting | US$600M |