Clean Energy · NS

Point Tupper Green Hydrogen

Summit deal plate

Wind-powered green ammonia, 200 kt/yr; hydrogen fully permitted

At a glance

Proponent
EverWind Fuels
Capex (as printed)
not disclosed
Capex (US$, midpoint)
not disclosed
Stage
Advanced / FEED
Location
45.60°N, 61.35°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway4 km
Major highway104 km
Transmission ≥230 kV105 km
Pipeline369 km
PortPictou106 km
Generating stationLingan (620 MW)124 km
City >50kHalifax206 km

Nearest other projects

Melford International TerminalMarine & Port4 km
Nova Scotia Spaceport (Canso)Advanced Manufacturing41 km
Nova Scotia Renewable Energy ParkClean Energy50 km
Goldboro GoldMinerals & Metals55 km
Trenton Energy StorageClean Energy100 km

Also in Nova Scotia

Wind WestEarly / conceptUS$44B
Nova Scotia Renewable Energy ParkAdvanced / FEEDUS$4.5B
Nova Scotia Grid Infrastructure (2×300 MW)Advanced / FEEDUS$1.2B
NovaporteAdvanced / FEEDUS$1.0B
Touquoy Mine Renewable Energy HubEarly / conceptUS$450M
Melford International TerminalShovel-readyUS$357M