5 GW offshore wind + transmission, 24 TWh/yr
Listed: US$44B in prospectus (≈ C$60B provincial figure). C$ ranges anchored on the comparables under each bar.
Build 2032–2039 at 55% construction value-added, then 8% of capex per year operating. Peak US$3.0B/yr · cumulative 2026–40 US$26B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 177 km | |
| Major highway | 177 km | |
| Transmission ≥230 kV | 262 km | |
| Pipeline | 387 km | |
| Port | Halifax | 180 km |
| Generating station | Halifax / Tufts Cove (350 MW) | 183 km |
| City >50k | Halifax | 182 km |
| Goldboro Gold | Minerals & Metals | 131 km |
| Nova Scotia Renewable Energy Park | Clean Energy | 134 km |
| 15 Mile Processing Hub | Minerals & Metals | 141 km |
| Nova Scotia Spaceport (Canso) | Advanced Manufacturing | 153 km |
| Touquoy Mine Renewable Energy Hub | Clean Energy | 154 km |
| Nova Scotia Renewable Energy Park | Advanced / FEED | US$4.5B |
| Nova Scotia Grid Infrastructure (2×300 MW) | Advanced / FEED | US$1.2B |
| Novaporte | Advanced / FEED | US$1.0B |
| Touquoy Mine Renewable Energy Hub | Early / concept | US$450M |
| Melford International Terminal | Shovel-ready | US$357M |
| Trenton Energy Storage | Advanced / FEED | US$275M |