Clean Energy · NS · #88 of 131 disclosed prospectus tickets

Touquoy Mine Renewable Energy Hub

Summit deal plate

Hydro + solar on a former gold mine

At a glance

Proponent
Dustin O'Leary (proponent)
Capex (as printed)
US$450M
Capex (US$, midpoint)
US$450M
Stage
Early / concept
Location
44.98°N, 62.88°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2032–2033 at 55% construction value-added, then 8% of capex per year operating. Peak US$124M/yr · cumulative 2026–40 US$482M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway41 km
Major highway44 km
Transmission ≥230 kV195 km
Pipeline252 km
PortHalifax66 km
Generating stationHalifax / Tufts Cove (350 MW)66 km
City >50kHalifax68 km

Nearest other projects

ScotiaPortMarine & Port16 km
15 Mile Processing HubMinerals & Metals22 km
Scotia Mine (zinc-lead)Minerals & Metals34 km
Nova Scotia Grid Infrastructure (2×300 MW)Clean Energy50 km
Enfield RTP Clean Fuel FacilityClean Energy51 km

Also in Nova Scotia

Wind WestEarly / conceptUS$44B
Nova Scotia Renewable Energy ParkAdvanced / FEEDUS$4.5B
Nova Scotia Grid Infrastructure (2×300 MW)Advanced / FEEDUS$1.2B
NovaporteAdvanced / FEEDUS$1.0B
Melford International TerminalShovel-readyUS$357M
Trenton Energy StorageAdvanced / FEEDUS$275M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register