Clean Energy · NL · #49 of 131 disclosed prospectus tickets

Bay d'Espoir Hydro Upgrade

Summit deal plate

+150 MW and modernization

At a glance

Proponent
NL Hydro
Capex (as printed)
US$1.1B
Capex (US$, midpoint)
US$1.1B
Stage
Feasibility / permitting
Location
47.98°N, 55.80°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2032 at 55% construction value-added, then 8% of capex per year operating. Peak US$209M/yr · cumulative 2026–40 US$1.3B.

US$0MUS$100MUS$200M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway108 km
Major highway109 km
Transmission ≥230 kV62 km
Pipeline839 km
PortClarenville138 km
Generating stationBay d'Espoir (613 MW)0 km
City >50kSt. John's237 km

Nearest other projects

EVREC Green Energy HubClean Energy133 km
Bull Arm Industrial Marine CentreMarine & Port148 km
Green Bay Copper-GoldMinerals & Metals215 km
North Atlantic Green Energy HubClean Energy217 km
Great Atlantic SaltMinerals & Metals224 km

Also in Newfoundland and Labrador

Churchill Falls / Gull Island HydroAdvanced / FEEDUS$37B
EVREC Green Energy HubAdvanced / FEEDUS$11B
North Atlantic Green Energy HubAdvanced / FEEDUS$5.1B
Kami Iron OreFeasibility / permittingUS$3.0B
Project Oqwatn (St. John's Dockyard)Advanced / FEEDUS$750M
Scully Manganese SulphateFeasibility / permittingUS$600M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register