75 ML SAF/yr; pre-FEED
Build 2028–2030 at 55% construction value-added, then 8% of capex per year operating. Peak US$96M/yr · cumulative 2026–40 US$688M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 9 km | |
| Major highway | 86 km | |
| Transmission ≥230 kV | 96 km | |
| Pipeline | 96 km | |
| Port | Squamish | 876 km |
| Generating station | Genesee (1,400 MW) | 150 km |
| City >50k | Edmonton | 96 km |
| Alberta Critical Minerals Recovery & REE Refining | Minerals & Metals | 70 km |
| Alberta Industrial Heartland 1.0 (waste-to-energy + CCS) | Clean Energy | 71 km |
| Blue & Turquoise Hydrogen / Methanol Modular Plant | Conventional Energy | 74 km |
| Gasia Homestead Diluent Recovery & Partial Upgrader | Conventional Energy | 79 km |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Conventional Energy | 83 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register