Clean Energy · AB · #87 of 131 disclosed prospectus tickets

Northern Spruce (pulp-mill BECCS)

Summit deal plate

500 kt biogenic CO₂/yr; FEED

At a glance

Proponent
Claude Létourneau (proponent)
Capex (as printed)
US$420M – US$500M
Capex (US$, midpoint)
US$420M – US$500M
Stage
Advanced / FEED
Location
53.40°N, 117.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 8% of capex per year operating. Peak US$127M/yr · cumulative 2026–40 US$639M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway1 km
Major highway260 km
Transmission ≥230 kV249 km
Pipeline66 km
PortSquamish564 km
Generating stationCascade Power (900 MW)61 km
City >50kEdmonton272 km

Nearest other projects

BW Velora — Grande PrairieDigital Technology212 km
Genesee Energy CampusClean Energy219 km
Yellowhead CopperMinerals & Metals245 km
Project Northern Lights (small-scale LNG)Conventional Energy256 km
Cariboo GoldMinerals & Metals265 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register