Conventional Energy · AB · #124 of 131 disclosed prospectus tickets

Project Northern Lights (small-scale LNG)

Summit deal plate

Small-scale LNG, proprietary tech; US$60M stage 1

At a glance

Proponent
Patrick Mills (proponent)
Capex (as printed)
US$60M – US$250M
Capex (US$, midpoint)
US$60M – US$250M
Stage
Shovel-ready
Location
54.30°N, 114.00°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2027–2028 at 55% construction value-added, then 12% of capex per year operating. Peak US$43M/yr · cumulative 2026–40 US$299M.

US$0MUS$20MUS$40M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway15 km
Major highway73 km
Transmission ≥230 kV90 km
Pipeline90 km
PortSquamish810 km
Generating stationGenesee (1,400 MW)110 km
City >50kEdmonton89 km

Nearest other projects

The Alberta Project (forestry residuals → RNG)Clean Energy67 km
Gasia Homestead Diluent Recovery & Partial UpgraderConventional Energy85 km
Blue & Turquoise Hydrogen / Methanol Modular PlantConventional Energy85 km
Alberta Industrial Heartland 1.0 (waste-to-energy + CCS)Clean Energy86 km
Alberta Critical Minerals Recovery & REE RefiningMinerals & Metals90 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register