150 MW data centre
Build 2028–2030 at 55% construction value-added, then 10% of capex per year operating. Peak US$321M/yr · cumulative 2026–40 US$2.6B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 7 km | |
| Major highway | 376 km | |
| Transmission ≥230 kV | 174 km | |
| Pipeline | 0 km | |
| Port | Ocean Falls | 662 km |
| Generating station | Site C (1,100 MW) | 174 km |
| City >50k | Prince George | 291 km |
| Gold Creek Industrial Complex | Conventional Energy | 112 km |
| Quintette Underground + Trend-Roman | Minerals & Metals | 148 km |
| Sweetwater Wind Farm | Clean Energy | 156 km |
| Northern Spruce (pulp-mill BECCS) | Clean Energy | 212 km |
| Wicheeda Rare Earth | Minerals & Metals | 214 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |