4.4 Blb Cu; 25-yr life
Build 2030–2033 at 55% construction value-added, then 15% of capex per year operating. Peak US$300M/yr · cumulative 2026–40 US$3.0B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 4 km | |
| Major highway | 111 km | |
| Transmission ≥230 kV | 112 km | |
| Pipeline | 47 km | |
| Port | Squamish | 324 km |
| Generating station | Mica (2,805 MW) | 93 km |
| City >50k | Kamloops | 113 km |
| Spanish Mountain Gold | Minerals & Metals | 171 km |
| Nicola Wind Energy Project | Clean Energy | 184 km |
| Cariboo Gold | Minerals & Metals | 209 km |
| Northern Spruce (pulp-mill BECCS) | Clean Energy | 245 km |
| Woodfibre LNG Expansion | Conventional Energy | 327 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |