Clean Energy · BC · #83 of 131 disclosed prospectus tickets

Sweetwater Wind Farm

Summit deal plate

210 MW with First Nations partnership; COD 2033

At a glance

Proponent
Jon Cooper (proponent)
Capex (as printed)
US$500M
Capex (US$, midpoint)
US$500M
Stage
Feasibility / permitting
Location
55.50°N, 121.20°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2032 at 55% construction value-added, then 8% of capex per year operating. Peak US$92M/yr · cumulative 2026–40 US$575M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway25 km
Major highway530 km
Transmission ≥230 kV80 km
Pipeline28 km
PortOcean Falls550 km
Generating stationSite C (1,100 MW)80 km
City >50kPrince George203 km

Nearest other projects

Quintette Underground + Trend-RomanMinerals & Metals56 km
Gold Creek Industrial ComplexConventional Energy67 km
Wicheeda Rare EarthMinerals & Metals112 km
BW Velora — Grande PrairieDigital Technology156 km
Baptiste NickelMinerals & Metals240 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register