Fully permitted gas-processing hub supporting LNG
Build 2027–2028 at 55% construction value-added, then 12% of capex per year operating. Peak US$69M/yr · cumulative 2026–40 US$483M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 4 km | |
| Major highway | 487 km | |
| Transmission ≥230 kV | 64 km | |
| Pipeline | 36 km | |
| Port | Stewart | 608 km |
| Generating station | Site C (1,100 MW) | 64 km |
| City >50k | Prince George | 261 km |
| Sweetwater Wind Farm | Clean Energy | 67 km |
| Quintette Underground + Trend-Roman | Minerals & Metals | 100 km |
| BW Velora — Grande Prairie | Digital Technology | 112 km |
| Wicheeda Rare Earth | Minerals & Metals | 171 km |
| Baptiste Nickel | Minerals & Metals | 305 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |