320 MW dispatchable; 15.4 GWh compressed-air storage; COD 2029
Build 2028–2030 at 55% construction value-added, then 7% of capex per year operating. Peak US$145M/yr · cumulative 2026–40 US$960M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 17 km | |
| Major highway | 181 km | |
| Transmission ≥230 kV | 123 km | |
| Pipeline | 194 km | |
| Port | Squamish | 987 km |
| Generating station | Genesee (1,400 MW) | 253 km |
| City >50k | Edmonton | 195 km |
| Vegreville Project (straw → SAF) | Clean Energy | 125 km |
| Canadian Showcase (diluent-free heavy oil upgrading) | Conventional Energy | 138 km |
| Alberta Industrial Heartland 1.0 (waste-to-energy + CCS) | Clean Energy | 152 km |
| Blue & Turquoise Hydrogen / Methanol Modular Plant | Conventional Energy | 159 km |
| Alberta Critical Minerals Recovery & REE Refining | Minerals & Metals | 159 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register