50 ktpa concentrate
Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$47M/yr · cumulative 2026–40 US$310M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 12 km | |
| Major highway | 577 km | |
| Transmission ≥230 kV | 101 km | |
| Pipeline | 841 km | |
| Port | Goose Bay | 462 km |
| Generating station | Churchill Falls (5,428 MW) | 228 km |
| City >50k | Chicoutimi | 557 km |
| Kami Iron Ore | Minerals & Metals | 15 km |
| Scully Manganese Sulphate | Minerals & Metals | 26 km |
| Churchill Falls / Gull Island Hydro | Power & Utilities | 227 km |
| Shaakichiuwaanaan (Li-Ta-Cs) | Minerals & Metals | 266 km |
| Strange Lake Rare Earths | Minerals & Metals | 436 km |
| Kino Aski LNG (cross-Canada to Québec port) | Early / concept | US$23B |
| Projet Mauricie | Advanced / FEED | US$3.0B |
| Strange Lake Rare Earths | Feasibility / permitting | US$2.2B |
| Courant Project (H₂ + hydro for ammonium nitrate) | Advanced / FEED | US$1.8B – US$2.1B |
| Contrecœur Container Terminal | Advanced / FEED | US$1.7B |
| Matawinie Graphite Mine | Advanced / FEED | US$1.3B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register