Minerals & Metals · BC · #19 of 131 disclosed prospectus tickets

Berg Copper

Summit deal plate

Cu-Mo-Ag; PFS 2026

At a glance

Proponent
Surge Copper
Capex (as printed)
US$3.4B
Capex (US$, midpoint)
US$3.4B
Stage
Feasibility / permitting
Location
53.80°N, 126.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2033 at 55% construction value-added, then 15% of capex per year operating. Peak US$510M/yr · cumulative 2026–40 US$5.2B.

US$0MUS$200MUS$400M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway65 km
Major highway543 km
Transmission ≥230 kV82 km
Pipeline69 km
PortOcean Falls177 km
Generating stationW.A.C. Bennett (2,876 MW)374 km
City >50kPrince George252 km

Nearest other projects

North Coast Transmission LinePower & Utilities82 km
LNG Canada Phase 2Conventional Energy139 km
Baptiste NickelMinerals & Metals177 km
Prince Rupert E-FuelsClean Energy257 km
Ksi Lisims LNG + PRGT PipelineConventional Energy270 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B
Roberts Bank Terminal 2Advanced / FEEDUS$2.6B