Conventional Energy · BC

LNG Canada Phase 2

Context — not in prospectus Fast-track list (MPO)

MPO tranche 1; ~C$33B private capital

At a glance

Proponent
LNG Canada (Shell, Petronas, PetroChina, Mitsubishi, KOGAS)
Capex (as printed)
C$33B C$ source
Capex (US$, midpoint)
US$24B
Stage
Advanced / FEED
Location
54.00°N, 128.70°W
Summit deal plate
No — context project (not in the investor prospectus)
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2028–2033 at 55% construction value-added, then 12% of capex per year operating. Peak US$2.9B/yr · cumulative 2026–40 US$32B.

US$0MUS$1.0BUS$2.0BUS$3.0B2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway2 km
Major highway636 km
Transmission ≥230 kV56 km
Pipeline3 km
PortOcean Falls195 km
Generating stationW.A.C. Bennett (2,876 MW)471 km
City >50kPrince George388 km

Nearest other projects

Prince Rupert E-FuelsClean Energy118 km
North Coast Transmission LinePower & Utilities124 km
Berg CopperMinerals & Metals139 km
Ksi Lisims LNG + PRGT PipelineConventional Energy143 km
Red Mountain & Premier GoldMinerals & Metals230 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B
Roberts Bank Terminal 2Advanced / FEEDUS$2.6B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register