Minerals & Metals · SK

McIlvenna Bay Copper

Context — not in prospectus Fast-track list (MPO)

MPO tranche 1; >50% built, production 2026

At a glance

Proponent
Foran Mining
Capex (as printed)
C$550M C$ source
Capex (US$, midpoint)
US$402M
Stage
Under construction
Location
54.85°N, 102.50°W
Summit deal plate
No — context project (not in the investor prospectus)
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2026–2027 at 55% construction value-added, then 15% of capex per year operating. Peak US$110M/yr · cumulative 2026–40 US$974M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway45 km
Major highway408 km
Transmission ≥230 kV144 km
Pipeline498 km
PortChurchill668 km
Generating stationGrand Rapids (MB) (479 MW)278 km
City >50kSaskatoon406 km

Nearest other projects

Loki Flake GraphiteMinerals & Metals174 km
Minago Critical MineralsMinerals & Metals235 km
Thompson Nickel MineMinerals & Metals310 km
Wheeler River UraniumMinerals & Metals358 km
North Star Project (BECCS)Clean Energy389 km

Also in Saskatchewan

Rook I UraniumUnder constructionUS$1.6B
Loki Flake GraphiteFeasibility / permittingUS$1.4B
PLS (Triple R) UraniumAdvanced / FEEDUS$1.2B
Prairie LithiumUnder constructionUS$881M
Covenant Energy (renewable diesel + SAF)Advanced / FEEDUS$653M
Boardwalk Lithium BrineFeasibility / permittingUS$600M