145 kt biogenic CO₂/yr; FEED
Build 2028–2029 at 55% construction value-added, then 8% of capex per year operating. Peak US$42M/yr · cumulative 2026–40 US$212M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 123 km | |
| Major highway | 251 km | |
| Transmission ≥230 kV | 253 km | |
| Pipeline | 252 km | |
| Port | Churchill | 1,012 km |
| Generating station | Genesee (1,400 MW) | 398 km |
| City >50k | Saskatoon | 247 km |
| Canadian Showcase (diluent-free heavy oil upgrading) | Conventional Energy | 142 km |
| Marguerite Lake Energy (CAES) | Power & Utilities | 165 km |
| Vegreville Project (straw → SAF) | Clean Energy | 250 km |
| SRC Minerals-to-Magnet | Minerals & Metals | 251 km |
| Prairie Connector Pipeline | Conventional Energy | 252 km |
| Rook I Uranium | Under construction | US$1.6B |
| Loki Flake Graphite | Feasibility / permitting | US$1.4B |
| PLS (Triple R) Uranium | Advanced / FEED | US$1.2B |
| Prairie Lithium | Under construction | US$881M |
| Covenant Energy (renewable diesel + SAF) | Advanced / FEED | US$653M |
| Boardwalk Lithium Brine | Feasibility / permitting | US$600M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register