Clean Energy · AB · #45 of 131 disclosed prospectus tickets

The Alberta Project (forestry residuals → RNG)

Summit deal plate

1 Mt/yr carbon removal; FEED

At a glance

Proponent
Greg Nuttall (proponent)
Capex (as printed)
US$1.3B
Capex (US$, midpoint)
US$1.3B
Stage
Advanced / FEED
Location
54.75°N, 113.30°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 8% of capex per year operating. Peak US$238M/yr · cumulative 2026–40 US$1.7B.

US$0MUS$100MUS$200M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway35 km
Major highway118 km
Transmission ≥230 kV58 km
Pipeline134 km
PortSquamish876 km
Generating stationGenesee (1,400 MW)171 km
City >50kEdmonton134 km

Nearest other projects

Project Northern Lights (small-scale LNG)Conventional Energy67 km
Alberta Industrial Heartland 1.0 (waste-to-energy + CCS)Clean Energy107 km
Blue & Turquoise Hydrogen / Methanol Modular PlantConventional Energy111 km
Alberta Critical Minerals Recovery & REE RefiningMinerals & Metals116 km
Gasia Homestead Diluent Recovery & Partial UpgraderConventional Energy117 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register