Minerals & Metals · BC · #67 of 131 disclosed prospectus tickets

Lawyers-Ranch Gold-Silver

Summit deal plate

4.6 Moz AuEq; PFS Dec 2025

At a glance

Proponent
Thesis Gold
Capex (as printed)
US$736M
Capex (US$, midpoint)
US$736M
Stage
Feasibility / permitting
Location
57.30°N, 127.30°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2032 at 55% construction value-added, then 15% of capex per year operating. Peak US$135M/yr · cumulative 2026–40 US$1.2B.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway69 km
Major highway866 km
Transmission ≥230 kV187 km
Pipeline318 km
PortStewart224 km
Generating stationW.A.C. Bennett (2,876 MW)343 km
City >50kPrince George472 km

Nearest other projects

Red Chris Mine ExpansionMinerals & Metals156 km
Red Mountain & Premier GoldMinerals & Metals219 km
Baptiste NickelMinerals & Metals291 km
North Coast Transmission LinePower & Utilities312 km
Ksi Lisims LNG + PRGT PipelineConventional Energy332 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register