MPO tranche 1
Build 2028–2030 at 55% construction value-added, then 15% of capex per year operating. Peak US$348M/yr · cumulative 2026–40 US$3.7B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 22 km | |
| Major highway | 850 km | |
| Transmission ≥230 kV | 94 km | |
| Pipeline | 409 km | |
| Port | Stewart | 197 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 498 km |
| City >50k | Prince George | 608 km |
| Lawyers-Ranch Gold-Silver | Minerals & Metals | 156 km |
| Red Mountain & Premier Gold | Minerals & Metals | 195 km |
| New Polaris (gold-antimony) | Minerals & Metals | 238 km |
| Ksi Lisims LNG + PRGT Pipeline | Conventional Energy | 319 km |
| Prince Rupert E-Fuels | Clean Energy | 382 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |