Heavy oil upgrading without diluent; FEED underway
Build 2028–2029 at 55% construction value-added, then 12% of capex per year operating. Peak US$58M/yr · cumulative 2026–40 US$380M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 10 km | |
| Major highway | 223 km | |
| Transmission ≥230 kV | 234 km | |
| Pipeline | 110 km | |
| Port | Squamish | 994 km |
| Generating station | Genesee (1,400 MW) | 286 km |
| City >50k | Edmonton | 234 km |
| Prairie Connector Pipeline | Conventional Energy | 110 km |
| Marguerite Lake Energy (CAES) | Power & Utilities | 138 km |
| Vegreville Project (straw → SAF) | Clean Energy | 138 km |
| North Star Project (BECCS) | Clean Energy | 142 km |
| Alberta Industrial Heartland 1.0 (waste-to-energy + CCS) | Clean Energy | 206 km |
| Rook I Uranium | Under construction | US$1.6B |
| Loki Flake Graphite | Feasibility / permitting | US$1.4B |
| PLS (Triple R) Uranium | Advanced / FEED | US$1.2B |
| Prairie Lithium | Under construction | US$881M |
| Covenant Energy (renewable diesel + SAF) | Advanced / FEED | US$653M |
| Boardwalk Lithium Brine | Feasibility / permitting | US$600M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register