Minerals & Metals · NS · #131 of 131 disclosed prospectus tickets

Scotia Mine (zinc-lead)

Summit deal plate

Brownfield; smallest ticket in the prospectus

At a glance

Proponent
EDM Resources
Capex (as printed)
US$25M
Capex (US$, midpoint)
US$25M
Stage
Advanced / FEED
Location
45.05°N, 63.30°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$7M/yr · cumulative 2026–40 US$53M.

US$0MUS$2MUS$4MUS$6M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway20 km
Major highway23 km
Transmission ≥230 kV165 km
Pipeline218 km
PortHalifax49 km
Generating stationHalifax / Tufts Cove (350 MW)48 km
City >50kHalifax50 km

Nearest other projects

Enfield RTP Clean Fuel FacilityClean Energy22 km
Nova Scotia Grid Infrastructure (2×300 MW)Clean Energy23 km
ScotiaPortMarine & Port24 km
Touquoy Mine Renewable Energy HubClean Energy34 km
NEXT — Atlantic Hub Container Terminal (Halifax)Marine & Port49 km

Also in Nova Scotia

Wind WestEarly / conceptUS$44B
Nova Scotia Renewable Energy ParkAdvanced / FEEDUS$4.5B
Nova Scotia Grid Infrastructure (2×300 MW)Advanced / FEEDUS$1.2B
NovaporteAdvanced / FEEDUS$1.0B
Touquoy Mine Renewable Energy HubEarly / conceptUS$450M
Melford International TerminalShovel-readyUS$357M