Marine & Port · NS

ScotiaPort

Summit deal plate

2,000-acre rail-served industrial / clean-energy hub

At a glance

Proponent
Ethan Crossman (proponent)
Capex (as printed)
not disclosed
Capex (US$, midpoint)
not disclosed
Stage
Early / concept
Location
45.10°N, 63.00°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway25 km
Major highway29 km
Transmission ≥230 kV179 km
Pipeline241 km
PortHalifax67 km
Generating stationHalifax / Tufts Cove (350 MW)67 km
City >50kHalifax69 km

Nearest other projects

Touquoy Mine Renewable Energy HubClean Energy16 km
Scotia Mine (zinc-lead)Minerals & Metals24 km
15 Mile Processing HubMinerals & Metals33 km
Nova Scotia Grid Infrastructure (2×300 MW)Clean Energy45 km
Enfield RTP Clean Fuel FacilityClean Energy45 km

Also in Nova Scotia

Wind WestEarly / conceptUS$44B
Nova Scotia Renewable Energy ParkAdvanced / FEEDUS$4.5B
Nova Scotia Grid Infrastructure (2×300 MW)Advanced / FEEDUS$1.2B
NovaporteAdvanced / FEEDUS$1.0B
Touquoy Mine Renewable Energy HubEarly / conceptUS$450M
Melford International TerminalShovel-readyUS$357M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register