5M TEU Pacific hub-and-spoke
Build 2032–2034 at 55% construction value-added, then 6% of capex per year operating. Peak US$303M/yr · cumulative 2026–40 US$1.5B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 23 km | |
| Major highway | 111 km | |
| Transmission ≥230 kV | 138 km | |
| Pipeline | 134 km | |
| Port | Port Alberni | 3 km |
| Generating station | Revelstoke (2,480 MW) | 511 km |
| City >50k | Nanaimo | 64 km |
| West Coast Oil Pipeline | Conventional Energy | 106 km |
| Roberts Bank Terminal 2 | Transportation | 123 km |
| Woodfibre LNG Expansion | Conventional Energy | 125 km |
| H2 Gateway hydrogen liquefaction | Clean Energy | 127 km |
| Sterling Shipyards (bulk export terminal) | Marine & Port | 131 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |